ALL NEWS :

On-site bonding with the HLB process

03/04/2024 - posted in MD WAY

When a leak occurs in a hydropower facility, rapid intervention is crucial, as it often leads to equipment shutdowns. PXL SEALS was among the first to implement non-stick technologies that makes it easy to replace a joint without dismantling the equipment. This reduces maintenance times, (...)

Tags : On-site, On-site bonding, HLB, Hot Layer Bonding, HLB press

EN SAVOIR PLUS

The sales team travels to the heart of our customers' facilities

13/09/2023 - posted in

Why would the sales team be to the core of our customers' facilities? For PXL Seals, it is the opportunity to properly measure and understand the issues and constraints and to be as close as possible to our customers. On the picture, Kerstin and Aurélie are visiting the (...)

Tags : genissiat, customers, issues, constraints, hydro

EN SAVOIR PLUS

Hydro Practitioners Conference in Graz

13/09/2023 - posted in HYDRO

Today we're visiting our customers at the Hydro Practitioners Conference in Graz, which brings together turbine manufacturers and hydro players from Austria, Switzerland, Luxembourg and Germany.     (...)

Tags : conference, hydro, turbine

EN SAVOIR PLUS

Blade seal maintenance: what are the solutions for replacing your Kaplan and Bulb turbine blade seals?

04/09/2023 - posted in On-site services

blade seals? Turbines are among the most strategic components found in hydroelectric power equipment. Among the various existing designs, vertical or horizontal Kaplan turbines are equipped with adjustable blades requiring the installation of dual-action seals. With over 30 years' (...)

Tags :

EN SAVOIR PLUS

Power of Water Canada Conference

31/05/2023 - posted in HYDRO

          Power of Water Canada Conference and Tradeshow - Day 2 ! Kerstin Allain, our Export Manager will come and visit you on your stand. Feel free to contact her for any questions ! Event link : https://lnkd.in/e_AsuJ35 (...)

Tags :

EN SAVOIR PLUS