BULB TURBINE - BLADE TRUNNION SEAL
Project:
BULB TURBINE - BLADE TRUNNION SEAL
Strasbourg, France
Challenge:
87-metre-long, 16-metre-wide and 15-metre-high seal of a concrete door, closing a basin in the port of Marseille.
Issue:
Replacement of the seal on site without disassembly.
Process:
On-site curing using MD WAY process (portable press)
The PXL SEALS solution:
Side seals, threshold seals and connection seals with the corner unit