REQUEST AN ESTIMATE
BLADE SEALS - Passos del Toros, Uruguay
Project :
KAPLAN TURBINE – BLADE SEALS
Passos del Toros, Uruguay
The challenges :
- Replacing the seal on-site without disassembly
Processes :
- On-site vulcanisation using the MD WAY process (portable press).
Solution used :
- The seal is designed and manufactured
- Box-jointing is carried out through vulcanisation and the seal joints are assembled
- A full job report is delivered